Colorbond® and other factory pre-finished steel products

 

Painting, Colour change and re-bonding of new colours

 

 

STEP 1: SET UP

 

Protecting your environment along with the safety of our workers is paramount. In order to ensure job safety we divert the down pipes to protect storm water run off. Any over hanging trees will also need to be trimmed back.

 

 

STEP 2: STRIPPER

 

This step is only applicable if the surface coating is delaminating and peeling. The stripper is specially formulated to remove the degraded material only and is applied to the roof using a low pressure pump. This is not a standard paint stripper. To learn more about the stripper follow the link.

 

STEP 3: WATER BLAST

 

To thoroughly clean the roof surface a powerful water blast is required. The pressure required is approx 5000psi. This will remove any dirt and contamination deposits on your roof.

 

 

STEP 4: PRIMER

 

If the roof has been stripped it will require an etch primer to adhere the top coat to the roof sheeting. This product is designed to bite into the roof sheeting and the top coat will adhere to the primer.

 

STEP 5: TOP COAT

 

Two coats of the acrylic lacquer top coat are applied to the roof. The first coat is generally applied across the roof perpendicular to the corrugation. The final coat is applied parallel to the corrugation. Where possible this coat is sprayed in a continual stream from gutter to ridge line. This continual stream will minimize the overspray lines that can occur with this type of coating.

 

STEP 6: RELAX

 

Sit back and relax knowing that Restyle has done the job that we quoted at a fixed price and cleaned up after ourselves before we left.

 

 

ß Complete our enquiry form to request a quotation or ask a question.  One of our friendly staff members will phone you back to discuss your requirements.

 

 

 

The REBOND process will vary depending on the reason for the rebonding of the colour coating.

 

 

If the colour has faded, uniformly or unevenly, then steps 2 and 5 are not required.

 

 

 

 

 

All steps are undertaken if the coating is delaminating or the roof has a stripped appearance.